Objective
To construct a bridge strong enough to hold a mini remote control vehicle from the material provided. The car has to be driven over the completed structure.
The Challenges
The team will be confronted with many challenges during this exercise mainly from the dynamics of their team. However, we have included a few extra:
 |
|
Limited resources
|
|
|
|
 |
|
The bridge must be free standing
|
|
|
|
 |
|
Time is restricted
|
|
|
|
 |
|
Can only build one bridge
|
|
|
|
 |
|
Must hold the weight of a mini
remote control car
|
|
|
|
 |
|
Must stay standing until the car
has been driven over it
|
|
|
|
|
|

Skills Required
An indoor challenge where the team has limited resources, limited time and an overflow of ideas. They must control them to gain the highest results. Some of the key skills required are highlighted below:
 |
|
Strong thought process
|
|
|
|
 |
|
Patience during construction
|
|
|
|
 |
|
Foresight
|
|
|
|
 |
|
Planning
|
|
|
|
 |
|
Time management
|
|
|
|
 |
|
Management of working groups
|
|
|
|
 |
|
Design
|
|
|
|
 |
|
Structural knowledge
|
|
|
|
 |
|
Communication
|
|
|
|
|